mdoc.oil.gov.iq Alsco Software
the company fields
badra field

First / Deion Badra field: -
      Badra oil field is located in Wasit province, is about 160 kilometers southeast of Baghdad province. The fields where a common border with the Islamic Republic of Iran. And the advantage of its oil light-API = 35O, and as an area of 96 km2 field within Iraqi territory (16 × 6) 2 km.
First / Deion Badra field: - 
     Badra oil field is located in Wasit province, is about 160 kilometers southeast of Baghdad province. The fields where a common border with the Islamic Republic of Iran. And the advantage of its oil light-API = 35O, and as an area of 96 km2 field within Iraqi territory (16 × 6) 2 km.
                                    
Second / editorial Badra field: -
     In the presence of a high-ranking official of the Ministry of Oil and the province of Wasit and others, it began the actual launch of commercial production of crude oil from the Badra oil field in production capacity amounted to 08/26/2014 (15000-17000) barrels / day. This came under the service contract signed between the Midland Oil Company and a coalition of investment companies led by Russian Gazprom: (TPAO / Petronas / Kocaz / Samsung / Halliburton / Weatherford / Techno / Tchamlbergr / CCP / Zbk) in addition to the Iraqi oil exploration company, after winning the contract within the second licensing rounds. And that this field is the second largest oil field after Ahdab field in Wasit province, followed by a third-party developer ALdafria field
                                 .
Mr. Director of the field department has confirmed, that the work is going as planned, and high technical standards. Although the stages of development of the field passing difficult problems quickly remedied those involved as a result of the concerted efforts of stakeholders. It is hoped the introduction of two additional wells for production during the second half of this year, bringing the total number of producing wells five wells, a production rate of (30000) barrels / day, the disposal of the strategic line through a tube measuring 24 knots. Note that the initial development plan requires the drilling of 17 wells productive implemented by Gazprom (the operator) and secondary allied companies.
On the other hand, he pointed to the section manager Mr. Pakistani Techno company under the direct detection and create an extended dry gas pipeline requirements of Badra field operations center to Wasit thermal station. Where it is expected to be completed at the end of next year, above the station for the processing of dry gas through this pipeline. This will contribute to the provision of alternative fuel from crude oil, which burned to generate electricity. As well as the exploitation of gas burned and to preserve the environment.

Third / future production of the Badra field: - technical studies and field development plans (initial development phase / second) under a service contract with the Russian company Gazprom, our forecast a promising future for the Badra oil field. Below where he is scheduled to reach the production levels set out after the completion of the second stage of development before the operating company contracting with the companies:
- The production of 17,000 barrels per day of crude oil.
- The production of more than 100 Mqmq of dry gas.
- The production of 660 tons of liquid gas.
- The production of approximately 300 tons of solid sulfur.
Third / future production of the Badra field: - 
technical studies and field development plans (initial development phase / second) under a service contract with the Russian company Gazprom, our forecast a promising future for the Badra oil field. Below where he is scheduled to reach the production levels set out after the completion of the second stage of development before the operating company contracting with the companies:- The production of 17,000 barrels per day of crude oil.- The production of more than 100 Mqmq of dry gas.- The production of 660 tons of liquid gas.- The production of approximately 300 tons of solid sulfur.

Published on: 03-11-2015 | All reads: 542
[ Return | Home Pages | Top ]
Last Topics from all SectionsDate
Visit Mr. Mohammed Bahr al-Ulum of Midland Oil Company 2016-02-17
Exhibition and Conference Basra sixth oil and gas 2016-02-09
goodbye party 2016-01-12
Create a second production line in a field east of Baghdad 2016-01-12
The sixty-fourth anniversary of the festival Iraqi police 2016-01-09
Army strength of unity and loyalty to the homeland 2016-01-06
Happy new year 2015-12-31
Social contribution to the field of Badra 2015-12-06
The use of electronic gate system 2015-11-17
Seminar to review the performance of productive reservoirs for 2014 2015-11-09
Post Midland Oil Company in the Baghdad International Fair edition 42 2015-11-09
The third conference of Iraqs oil and ga 2015-11-09
last update: [ 2016-02-17 ]
Last added topicsMore reads topics
Visit Mr. Mohammed Bahr al-Ulum of Midla...
Exhibition and Conference Basra sixth oi...
goodbye party
Create a second production line in a fie...
The sixty-fourth anniversary of the fest...
Visit Mr. Mohammed Bahr al-Ulum of Midla...
Create a second production line in a fie...
The third conference of Iraqs oil and ga
Post Midland Oil Company in the Baghdad ...
goodbye party
      
Main Menu
E-mail
 E-mail:  
 Password:  
 browsing:  

List of Votes
 What do you think of our department?
Excellent
Very good
Good



Result
More polls

Number of voters: 31
On-site registration


Hello,
زائرنا الكريم

New memberNew member
User name:
Password:

 

صفحة جديدة 1
All Traffic To This Web Is Monitored and Scanned By Secure Gateway